Group 8 Assembly
ME440 / AER440 Project 1, Fall 2026
Group 8
Part A due Oct 20
Created: 2026-10-20 Tue 10:41
Pivot
- M5 shoulder bolt, two MR106ZZ bearings
- Sleeve and shims set the bearing spacing
- Nylon-lock nut holds the preload
Rails
- Two 4 mm rails, 300 mm long, 16 mm apart
- End stops at both ends
Linkage
- Hitec HS-5645MG servo, 32 mm horn
- Rod ends at both joints
- Joint 130 mm from the pivot, about 4:1
- Preload spring against backlash
Sensor mount
- VL53L1X on an arm at the sensor end
- Nearest ball surface 47 mm (minimum range 40 mm)
Base and servo cage
- Base plate and two uprights
- Servo held in a plate cage below the beam